EICR Schedule of Inspections Explained

The inspection schedule is the traceable record of what was visually checked; it must match the agreed extent and the actual installation.

Updated 3 Sep 20268 min read

An EICR combines inspection and testing. The inspection schedule supports the visual element by showing which relevant items were assessed, which were not applicable and which could not be inspected.

This is practical guidance for competent electricians. Assess the actual installation, follow the current edition of BS 7671 and manufacturer instructions, and stop where the work cannot be completed safely.

Key takeaways

  • Agree the scope and make the installation safe before starting work.
  • Use a controlled sequence rather than relying on a single reading or visual assumption.
  • Record the actual result, limitation or action taken while it is still traceable.
  • Check the result against the design, protective measures and equipment instructions.
  • Issue the appropriate certificate or report when the work is complete.

Scope the work first

An EICR combines inspection and testing. The inspection schedule supports the visual element by showing which relevant items were assessed, which were not applicable and which could not be inspected.

Method

Agree access, sampling and operational constraints before work begins. Follow the relevant schedule systematically, inspect accessible parts of the installation and make every limitation specific to the item, location and reason.

Doing this on a job? EICR Certificate — part of TradePlanr. Free to start, no card needed.

Checks and common pitfalls

A tick-box schedule does not compensate for vague scope or inaccessible equipment. Check that observations, test results and limitations align; an item marked satisfactory should be supported by enough inspection evidence.

Record and hand over

Attach or retain the completed schedule with the EICR and explain material limitations to the client. Use it to support a clear remedial scope rather than leaving them to infer what was inspected.

Keep the evidence with the job

Record readings, limitations and remedial actions as you work. A clear certificate or report protects the client and makes the next visit easier to manage.

From guidance to action

Frequently asked questions

Does a schedule of inspections replace testing?

No. It records the inspection element of the EICR. Testing and appropriate investigation are still needed to support the report's conclusions.

Can I rely on a standard rule of thumb?

No. The installation method, supply characteristics, equipment instructions and the current requirements all affect the correct decision. Use the guide as a workflow, then assess the actual job.

What should be recorded?

Record the scope, results, limitations, observations, remedial work and the certificate or report appropriate to the work carried out.

Related guides

Want more work coming in?

TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.

Explore TradePlanr Agency
Start Now — It's Free

Free to start · No card · No download needed — works in your browser

Download on the App StoreGet it on Google Play