Building Regs Part G3

Unvented Hot Water Commissioning Certificate (Building Regs Part G3)

An unvented hot water commissioning certificate records that an unvented hot water storage system has been installed and commissioned correctly in line with Building Regulations Part G3. It confirms the safety devices, pressures and temperatures were checked before the system was handed over.

Because unvented systems store hot water under mains pressure, the work is notifiable and must be carried out by an operative holding a recognised unvented hot water storage systems qualification. A commissioning record provides the evidence that the installation is safe and compliant.

TradePlanr lets you fill in the full commissioning record on your phone or tablet at the point of handover, capture the customer signature and produce a professional PDF certificate without paperwork back at the office.

Issue this certificate from your phone

TradePlanr generates this and 35+ other gas, electrical, oil, plumbing and renewables certificates as proper PDFs — filled on site, signed on screen and stored against the job. Works even with no signal. Free to download.

Download on the App StoreGet it on Google Play

What it covers

  • Installation and site details, including cylinder make, model and capacity
  • Expansion vessel and expansion valve settings and pressures
  • Temperature and pressure relief valve operation and discharge arrangements
  • Tundish and discharge pipework checks
  • Thermostat and high-limit cut-out settings and testing
  • Confirmation that the work is notifiable under Building Regulations Part G3
  • Installer qualification details and customer sign-off

When it's required

A G3 commissioning certificate is required whenever an unvented hot water storage system with a capacity over 15 litres is installed, replaced or significantly altered. The work is notifiable, so building control must be informed or the work self-certified under a competent person scheme.

The operative carrying out and commissioning the system must hold a current unvented hot water storage systems qualification. Without it, the installation cannot be lawfully self-certified.

The certificate should be issued to the customer on completion and kept alongside the manufacturer's documentation, as it may be requested during a property sale, insurance claim or warranty enquiry.

How to issue it in TradePlanr

  1. 1

    Enter the system and site details

    Record the property address, cylinder make, model and capacity, and the type of unvented system installed so the certificate identifies the exact appliance.

  2. 2

    Record safety device settings

    Log the expansion vessel charge pressure, expansion and temperature or pressure relief valve settings, thermostat and high-limit cut-out values, and confirm the discharge arrangements.

  3. 3

    Confirm notifiable status and qualification

    Tick the checks that confirm the work is notifiable under Part G3 and enter your unvented hot water qualification details for the compliance record.

  4. 4

    Sign and store the PDF

    Capture the customer signature on screen, generate the PDF certificate and store it against the job, ready to email or hand over on the spot.

Frequently asked questions

Is a G3 certificate a legal requirement?

Installing an unvented hot water storage system over 15 litres is notifiable under Building Regulations Part G3. The commissioning certificate is the record that the notifiable work has been done and self-certified correctly, so it is effectively required for compliant installations.

Who can commission an unvented hot water system?

Only an operative holding a recognised unvented hot water storage systems qualification can lawfully install, commission and self-certify the work. TradePlanr records your qualification details on the certificate.

What does the G3 commissioning check cover?

It covers the safety devices that protect against overheating and overpressure, including the expansion vessel, expansion and relief valves, thermostat, high-limit cut-out, tundish and discharge pipework.

Can I complete the certificate on site?

Yes. TradePlanr is built for on-site completion, so you can fill in every field, capture the signature and produce the PDF at the property before you leave.