Skip to main content
MCS F26B

Heat Pump Handover Certificate (MCS F26B)

Fill it in on site, sign on screen, and send a professional MCS F26B PDF before you leave the job.

Free to build · Send it with a 7-day free trial

Need a MCS F26B for your own property? It's issued by the tradesperson who does the work — TradePlanr is the app they use.

The MCS F26B is the handover certificate that confirms a heat pump installation meets MCS requirements. It records that the system has been designed, installed and commissioned correctly and that the customer has been given the information they need to operate it.

It is a key part of MCS certification. The handover certificate, along with the wider MCS documentation, supports registration of the installation and is typically needed to access grant schemes such as the Boiler Upgrade Scheme.

The real F26B is a fixed official MCS form made up of around sixteen fields. TradePlanr helps you capture those details on site and produce a completed PDF, so the handover is documented before you leave the job.

2,500+
Tradespeople onboard
20k+
Certificates generated
5 min
Avg. to create & send
7-day
Free trial

What it covers

  • Customer and installation address details
  • MCS-accredited installer and installation company details
  • Heat pump make, model and system type
  • Confirmation the install has been designed, installed and commissioned to MCS requirements
  • A performance estimate for the installation
  • Confirmation that the customer handover and demonstration has taken place
  • Commissioning and handover date with the required signatures

When it's required

The MCS F26B handover certificate is completed when a heat pump installation is handed over to the customer. It forms part of the documentation an MCS-accredited installer produces to certify the install.

Because MCS certification underpins eligibility for grant schemes such as the Boiler Upgrade Scheme, a properly completed handover certificate is important for both compliance and for the customer accessing any available funding.

It is normally completed alongside the manufacturer's commissioning record, so together they evidence that the appliance was set up correctly and the install meets MCS requirements.

How to issue it in TradePlanr

  1. 1

    Enter installation and installer details

    Record the customer address, the MCS-accredited installer and company details, and the heat pump make, model and system type.

  2. 2

    Confirm MCS compliance

    Tick off that the installation has been designed, installed and commissioned to MCS requirements, matching the official F26B fields.

  3. 3

    Record performance estimate and handover

    Enter the performance estimate for the system and confirm that the customer handover and demonstration has been carried out.

  4. 4

    Sign and store the PDF

    Capture the required signatures, then generate a PDF handover certificate to give the customer and keep with your MCS documentation.

Issue this certificate from your phone or the web

TradePlanr generates this and 79 other gas, electrical, oil, plumbing and renewables certificates as proper PDFs — filled on site, signed on screen and stored against the job. Works even with no signal. Free to start.

Frequently asked questions

What is an MCS F26B?

The MCS F26B is the official heat pump handover certificate. It confirms the installation meets MCS requirements, records a performance estimate and documents the customer handover. It is a fixed form of around sixteen fields.

Why do I need an MCS handover certificate?

It is part of MCS certification for the installation. MCS certification supports registration and is typically needed to access grant schemes such as the Boiler Upgrade Scheme.

Who can complete an F26B?

The handover certificate is completed by the MCS-accredited installer responsible for the heat pump installation as part of certifying the install.

Does the F26B replace the manufacturer's commissioning record?

No. The F26B confirms the install meets MCS requirements, while the manufacturer's Benchmark record confirms commissioning against their instructions. Both are usually completed at handover.

What goes in an MCS handover pack?

The MCS handover pack for a heat pump typically includes the F26B handover certificate, the Benchmark commissioning record, the MCS certificate, the electrical installation certificate, the DNO notification confirmation where applicable, the performance estimate, user instructions and warranty documents.

Want more work coming in?

TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.

Explore TradePlanr Agency
Start Now — It's Free

Free to start · No card · No download needed — works in your browser

Download on the App StoreGet it on Google Play