Do I need to notify building control for a stove install?
Yes. Installing a solid fuel appliance is controlled work, so it must be notified to building control, either directly or by self-certifying through a competent person scheme such as HETAS.
Fill it in on site, sign on screen, and send a professional HETAS PDF before you leave the job.
Free to build · Send it with a 7-day free trial
Need a HETAS for your own property? It's issued by the tradesperson who does the work — TradePlanr is the app they use.
A solid fuel commissioning record documents the installation and commissioning of a stove, biomass appliance or other solid fuel appliance, confirming the work complies with Building Regulations Approved Document J and the appliance has been left safe and working correctly.
Installers registered with a competent person scheme such as HETAS can self-certify their work to building control, and the commissioning record captures the checks that support that notification, from hearth and clearances to the flue draught and spillage tests.
TradePlanr lets you record the appliance, flue and commissioning checks on your phone at the property and produce a clean PDF for the customer and your records, alongside the scheme notification.
Installing a solid fuel appliance is controlled work under Building Regulations, so every new stove or biomass appliance install needs to be notified to building control, either directly or through a competent person scheme such as HETAS.
Approved Document J sets the requirements for hearths, flues, ventilation and carbon monoxide alarms, and the commissioning record is the evidence those requirements have been met before the appliance is handed over.
The customer keeps the record with their property documents, where it supports the certificate of compliance, future servicing and chimney sweeping, and questions raised during a house sale.
Record the customer, the appliance make, model and output, and where it is installed, along with the chimney or flue serving it.
Log the hearth, clearances, ventilation and flue details required by Approved Document J, including the flue draught reading.
Record the spillage and smoke evacuation checks, confirm the CO alarm is fitted and tested, and note the handover advice given to the customer.
Capture the signature, generate the PDF commissioning record and store it against the job, ready to hand over alongside the scheme notification.
TradePlanr generates this and 79 other gas, electrical, oil, plumbing and renewables certificates as proper PDFs — filled on site, signed on screen and stored against the job. Works even with no signal. Free to start.
Yes. Installing a solid fuel appliance is controlled work, so it must be notified to building control, either directly or by self-certifying through a competent person scheme such as HETAS.
Yes. Approved Document J requires a carbon monoxide alarm in the room where a new or replacement solid fuel appliance is installed, and the commissioning record confirms it is fitted and tested.
The record covers the hearth, clearances, ventilation, flue details and draught reading, plus spillage checks after lighting, confirming the appliance is safe to leave in use.
Yes. TradePlanr lets you record the appliance, flue and commissioning checks, capture the signature and produce the PDF at the property.
The OFTEC CD/10 completion report for a new or replacement oil-fired installation.
The OFTEC CD/11 record for servicing and commissioning oil-fired appliances.
The Benchmark commissioning checklist completed when a boiler or heating system is installed.
TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.
Explore TradePlanr Agency