A 7 kW charger is a sustained load, so the cable must be selected from the supply, route and protective measures as a complete circuit design.

Updated 3 Sep 20268 min read

EV cable sizing begins with the charge-point rating and available supply capacity, then accounts for installation method, ambient temperature, grouping, voltage drop and the selected protective device. The longest driveway run is often the deciding factor.

This is practical guidance for competent electricians. Assess the actual installation, follow the current edition of BS 7671 and manufacturer instructions, and stop where the work cannot be completed safely.

Key takeaways

  • Agree the scope and make the installation safe before starting work.
  • Use a controlled sequence rather than relying on a single reading or visual assumption.
  • Record the actual result, limitation or action taken while it is still traceable.
  • Check the result against the design, protective measures and equipment instructions.
  • Issue the appropriate certificate or report when the work is complete.

Scope the work first

EV cable sizing begins with the charge-point rating and available supply capacity, then accounts for installation method, ambient temperature, grouping, voltage drop and the selected protective device. The longest driveway run is often the deciding factor.

Method

Survey the supply and proposed route, establish design current and diversity/load-management approach, apply correction factors, check voltage drop and verify the protective-device and disconnection arrangement. Follow the charge-point manufacturer's instructions.

Doing this on a job? Cable sizing calculator — part of TradePlanr. Free to start, no card needed.

Checks and common pitfalls

Do not select a cable only from a typical 7 kW installation. Thermal insulation, buried sections, grouping, long runs, PME arrangements and equipment-specific RCD/DC protection can materially change the design.

Record and hand over

Keep the calculation, cable route, device details, test results and commissioning information with the EV certificate. Explain any load-management settings and supply limitations to the client.

Keep the evidence with the job

Record readings, limitations and remedial actions as you work. A clear certificate or report protects the client and makes the next visit easier to manage.

From guidance to action

Frequently asked questions

Is there one standard cable size for a 7 kW charger?

No. A 7 kW charger has a common design current, but cable size depends on route length, installation method, correction factors, voltage drop and protective arrangements.

Can I rely on a standard rule of thumb?

No. The installation method, supply characteristics, equipment instructions and the current requirements all affect the correct decision. Use the guide as a workflow, then assess the actual job.

What should be recorded?

Record the scope, results, limitations, observations, remedial work and the certificate or report appropriate to the work carried out.

Related guides

Want more work coming in?

TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.

Explore TradePlanr Agency
Start Now — It's Free

Free to start · No card · No download needed — works in your browser

Download on the App StoreGet it on Google Play