Skip to main content
MCS · BS 7671

Solar PV Installation Check List App

Fill it in on site, sign on screen, and send a professional PV Install PDF before you leave the job.

Free to build · Send it with a 7-day free trial

Need a PV Install for your own property? It's issued by the tradesperson who does the work — TradePlanr is the app they use.

The installation check list confirms a solar PV system has been installed to the design, to MCS requirements and to BS 7671, and is ready for commissioning. It covers the mechanical and electrical installation before the DC and AC tests are carried out.

TradePlanr gives you a clear pre-commissioning checklist — mounting and weatherproofing, DC cabling and management, isolation, earthing and bonding, surge protection, inverter and battery, and labelling — plus space for any outstanding items.

Sign on screen and issue a branded PDF as part of the installation documentation.

2,500+
Tradespeople onboard
20k+
Certificates generated
5 min
Avg. to create & send
7-day
Free trial

What it covers

  • Module and array details and the MCS certificate number
  • Mounting security, structural suitability and roof weatherproofing
  • DC cabling UV-resistance, support and cable management
  • DC and AC isolation, earthing / bonding and surge protection
  • Inverter mounting and ventilation, and battery location where fitted
  • Dual-supply and isolation labelling, and readiness for commissioning

When it's required

The installation check list is completed once the PV system is installed and before it is commissioned.

It supports the MCS installation records and precedes the array test and commissioning certificate.

How to issue it in TradePlanr

  1. 1

    Record the array

    Add the modules, array power, inverter and mounting details.

  2. 2

    Work the checklist

    Tick off the mechanical and electrical installation checks.

  3. 3

    Note outstanding items

    Record anything still to be resolved before commissioning.

  4. 4

    Sign and issue

    Sign on screen and produce a branded PDF.

Issue this certificate from your phone or the web

TradePlanr generates this and 79 other gas, electrical, oil, plumbing and renewables certificates as proper PDFs — filled on site, signed on screen and stored against the job. Works even with no signal. Free to start.

Frequently asked questions

Is the check list the same as commissioning?

No. The check list confirms the installation is complete and ready; commissioning is the DC and AC testing and handover that follows.

Does this replace the MCS paperwork?

It complements it. The check list documents the installation checks; the MCS certificate and commissioning records complete the picture.

Want more work coming in?

TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.

Explore TradePlanr Agency
Start Now — It's Free

Free to start · No card · No download needed — works in your browser

Download on the App StoreGet it on Google Play