Skip to main content
MCS · BS 7671

Solar PV System Verification Certificate App

Fill it in on site, sign on screen, and send a professional PV Verify PDF before you leave the job.

Free to build · Send it with a 7-day free trial

Need a PV Verify for your own property? It's issued by the tradesperson who does the work — TradePlanr is the app they use.

The verification certificate confirms that a solar PV installation has been checked against the design, MCS requirements and BS 7671. It cross-checks the DC test results, the AC and grid connection, the isolation and labelling, the earthing, and the MCS and DNO documentation.

TradePlanr records the verification checks, a sample re-test, and any non-conformities and recommendations.

Issue a branded PDF that provides assurance before the MCS certificate is issued or the system handed over.

2,500+
Tradespeople onboard
20k+
Certificates generated
5 min
Avg. to create & send
7-day
Free trial

What it covers

  • Module and array details and the MCS certificate number
  • Design verified against MCS and BS 7671
  • DC array test results and AC / grid connection verified
  • Isolation, labelling and earthing verified
  • MCS certificate and DNO notification verified, and documentation checked
  • Non-conformities and recommendations

When it's required

Verification is used where assurance of a PV installation is required — before issuing the MCS certificate, at handover, or where a client asks for an independent check.

It complements the array test and commissioning certificate.

How to issue it in TradePlanr

  1. 1

    Record the array

    Add the modules, array power, inverter and mounting details.

  2. 2

    Verify each area

    Confirm the design, DC results, AC connection, isolation, earthing and documentation.

  3. 3

    Re-test a sample

    Carry out and record a sample re-test.

  4. 4

    Sign and issue

    Record non-conformities and recommendations, sign on screen and produce a branded PDF.

Issue this certificate from your phone or the web

TradePlanr generates this and 79 other gas, electrical, oil, plumbing and renewables certificates as proper PDFs — filled on site, signed on screen and stored against the job. Works even with no signal. Free to start.

Frequently asked questions

How is verification different from commissioning?

Commissioning proves the installed system works. Verification is a check that the design, testing, connection and documentation all comply with MCS and BS 7671.

When would I verify a PV system?

Before issuing the MCS certificate, at handover, or where a client or scheme requires an independent check of the installation.

Want more work coming in?

TradePlanr Agency builds custom-coded, SEO-optimised websites and runs Google Ads for UK trades — from £375, by the team behind TradePlanr.

Explore TradePlanr Agency
Start Now — It's Free

Free to start · No card · No download needed — works in your browser

Download on the App StoreGet it on Google Play